Prefabricated house production process

It takes approximately 2 months for the project of prefabricated house to be completed. We produce houses according to different country-specific building requirements. Please find more information about them here. The planning and production process takes the following stages:

1. Gathering information from the customer

During this phase the needs of the customer are identified. The client is consulted on how to achieve the best result using the best combination of materials and the construction. Our long international experience allows us to give a valuable input as well as to use country-specific technology that is approved by local authorities (e.g. SINTEF in Norway, RAL in Germany). We offer also other woodworking services for our customers if they need fences, carports, ells etc.

Get offer

2. Finalizing the drawings, preparing production drawings

When all the details are known and suitable for our customer, we start making production drawings that are required to calculate the required strength and support for the supporting walls as well as other constructions. This phase normally takes 3-4 weeks. These drawings show how each element will be constructed and connected and what materials will be used. 3D modelling software is used for developing each house's structural drawings.

Construction drawings, SEMA Holzbau

3. Production process

Just as the production drawings are finished, the production of the house starts. The elements of the house are produced using calculations from computer that are calculated with 1 mm precision – resulting in a high quality and very accurate structure. The production process time depends on the size of the project. Normally the standard 150sqm house takes 3-4 weeks to be produced. The elements of the finished house are transported to our warehouse where later they are transported to the building site using standard trucks. Every week we update our clients with photos from production to see how the house is being built and what materials are used in the construction.

4. Assembling

The houses are usually mounted straight from the trucks or containers by means of a crane that is most often needed for the first 5 days or a week, if the house is bigger. Average size building fits into two – three trucks. For the assembly of a house, modern sealing materials, galvanized fasteners and anchors (for anchoring to the foundation) are used. Our houses can be mounted and assembled by other subcontractors – construction companies or even homeowners themselves.

5. Finalizing the project

The project is considered as finalized only after strict inspection from both the customer and our quality specialist. The guarantee is provided to all our products without any special conditions.